In 2019, Phoenix engaged in a pilot with a water solutions provider in Pennsylvania. The goal of the pilot was to gather the necessary data on the systems capabilities and test data collection . The pilot exceeded the clients expectations and they have signed an LOI for multiple 1M LPD systems.

Blank Diagram (29).png

Oil & Gas Sector

System Size: 95,000 liter per day

Installation Date: March 2019

Input Water: 55,000 to 100,000 TDS

Output Goal: <500 TDS

Recovery Rate: 60 to 88%


Based on the successful pilot, Phoenix earned a letter of intent for 10 1M liter per day systems

Please see below for section of results from the test: